Determination of Sub-Contractors Using AHP and SAW Method

  • Arif Zikri Universitas Budi Luhur
  • Adam Syahputra Cristanto Universitas Budi Luhur
  • Imelda Universitas Budi Luhur
Keywords: Selection, company, Contractor

Abstract

One factor in the durability of a contractor company is its sub-contractor. The management of sub-contractors for companies engaged in construction services is one aspect of the company's durability to be able to complete the project that the selection is doing manually by viewing one single file That is sent by the company who wants to be a sub-contactor, it is of course besides very troublesome also inefficient and time consuming quite a while. In determining the winner of the Procurement Committee is still having difficulty to determine the standard of the company that will become a sub-contractor, not to mention the assessment is subjective so that the elected candidate is not the best candidate. The methods used in this research use Analytical Hierarchy Process (AHP) for weighting of criteria and for calculation of value using Simple Additive Weighting (SAW) of the results of the research obtained from the SAW method used Obtained by the best sub-contractor of PT. 4Cipta with a total of 0.962 from 5 alternatives listed

Downloads

Download data is not yet available.

References

Permatasari Diah, dkk. 2018. Penerapan Metode AHP Dan SAW Untuk Penentuan Kenaikan Jabatan Karyawan, Jurnal Teknik Informatika dan Sistem Informasi, Vol.5, No.1 Hal 60-73.

Andi Syafrianto. 2016. Penerapan Algoritma Ahp Dan Saw Dalam Pemilihan Penginapan Di Yogyakarta. Jurnal Ilmiah DASI Vol. 17 No. 4, Hal. 7-12

Agustina, S., Rachmadi, A., dan Wicaksono, S.A. 2013, SistemPendukung Keputusan Penentuan Prioritas Pelanggan Dealer Suzuki Soekarno-Hatta Malang MenggunakanMetode AHP dan SAW. Repositori Jurnal Mahasiswa PTIIK UB. Vol. 3 No.3

Yustina Meisella Kristania. 2018. Implementasi Kombinasi Metode Ahp Dan Saw Dalam Pendukung Keputusan Penentuan Kredit Perumahan Rakyat, Jurnal Telematika Vol. 11 No. 1. Hal. 66-78

Ni Wayan Ari Ulandari, dkk. 2018. Implementasi Metode AHP dan SAW dalam Sistem Pendukung Keputusan Prediksi Potensi Akademik Mahasiswa STMIK STIKOM Bali, Prosiding Seminar Nasional Pendidikan Teknik Informatika, Hal. 223-227

A. Afshari, dkk. 2010. Simple Additive Weighting approach to Personnel Selection problem, International Journal of Innovation, Management and Technology, Vol. 1, No. 5. Hal. 7 -12.

Saaty, T.L. 1991. Pengambilan Keputusan bagi para Pemimpin, Proses; HirarkiAnalitik untuk Pengambilan Keputusan dalam situasi yang Kompleks. SeriManajemen no.134, PPM, Jakarta

Agustina, S., Rachmadi, A., dan Wicaksono, S.A. 2013, SistemPendukung Keputusan Penentuan Prioritas Pelanggan Dealer Suzuki Soekarno-Hatta Malang MenggunakanMetode AHP dan SAW. Repositori Jurnal Mahasiswa PTIIK UB. Vol. 3 No.3

Kusumadewi, S. et al. 2006. Fuzzy Multi-Attribute Decision Making (FUZZY MADM). Graha Ilmu. Yogyakarta

Marimin dan Maghfiroh, N. 2013, Aplikasi Teknik Pengambilan Keputusan dalamManajemen Rantai Pasok, cetakan Ketiga, PT Penerbit IPB Press, Bogor.

Mujito, dkk. 2018. Selection of Prospective Employees Using Analytical Hierarchy Process (AHP) and ISO 9126. Proceedings of Icaiti. Hal. 46-50..

Published
2022-03-25
How to Cite
Zikri, A., Cristanto, A. S., & Imelda, I. (2022). Determination of Sub-Contractors Using AHP and SAW Method. Journal of Systems Engineering and Information Technology (JOSEIT), 1(1), 10 - 17. https://doi.org/10.29207/joseit.v1i1.1834
Section
Articles